Repair of corroded reinforced concrete elements.
Corrosion repaired area: 6000 m2
Total repairs: 300 m3
Port A-B Pier site concrete & drainage line (infrastructure) construction
Eren Holding Çorlu Cardboard Factory
Floor reinforcement with CFRP System. Approx. 1800 mtul High Strength CFRP Ribbon application.
Renovation of deformed dewatering bunker in Unit 325.